MUNICIPAL INTRANET GATEWAY - NODE 01 (CARIBOU BASIN)
Welcome to the Fell River Water & Power regional monitoring network. Public web queries and remote citizen account access remain offline pending scheduled switchgear recertification and seasonal telemetry recalibration.
NOTICE // DIRECTIVE 84-C IN EFFECT
External routing packets beyond Zone 1 perimeter switchboards are currently buffered.
All field staff assigned to Special Works at the East Boundary cut are required to log physical muster with Section Dispatch prior to departure.
| SUBSYSTEM | JURISDICTION | TELEMETRY STATUS |
|---|---|---|
| Intake Conduit 04 | Zone 1 (Flats) | NOMINAL (99.4%) |
| Substation 02 Spur | Zone 2 (Upper Bench) | 60 Hz CARRIER LOCKED |
| Regional Bus Loop Display | Zone 1 Central Depot | ADVISORY ACTIVE (STORMWATER) |
| East Cut Intake / Site 09 | East Boundary | [UNASSIGNED / ACCESS DENIED] |
* Inquiries regarding municipal drainage permits, cattle crossing right-of-ways, or line clearing should be submitted in person at the Zone 1 Works Yard desk between 07:30 and 15:00 PST.